Skip to content
LearnClash logoLearnClash
Lean Project Methodologies

Lean Project Methodologies quiz

3 questions. No signup. Your move.

Question 1 of 3Easy

What does the Japanese word 'Kanban' literally translate to in English?

Free to play, no ads.Get the app
40
Questions
8
ELO tiers
Spaced repetition

More questions about Lean Project Methodologies

These visible examples show the question style. LearnClash turns the full topic into ranked duels and spaced repetition.

  1. 1 Easy

    In Lean, what is "waste" called in Japanese?

    Answer: Muda

    Why: Toyota teaches that the other two of the three Ms, overburden and unevenness, are the root causes that keep generating it.

  2. 2 Medium

    Which researcher originally coined the term 'Lean' in a 1988 article?

    Answer: John Krafcik

    Why: He was an MIT graduate student on the International Motor Vehicle Program at the time, and later ran Hyundai in North America before leading Waymo.

  3. 3 Hard

    What practice levels out production to reduce the "bullwhip effect"?

    Answer: Heijunka

    Why: The name for the whipping effect is a supply chain import: Jay Forrester modelled it at MIT and Procter and Gamble staff supplied the nickname.

  4. 4 Easy

    Which tool visually maps the flow of materials and information?

    Answer: Value Stream Map

    Why: Toyota calls it the material and information flow diagram, and it is the one tool that puts both of those flows on the same page.

  5. 5 Medium

    Which Lean tool puts a whole problem and its plan on one sheet of paper?

    Answer: A3 report

    Why: The name is the paper size: 297 by 420 millimetres has to hold the problem, the root cause, the countermeasures and the follow-up.

  6. 6 Hard

    What is the Lean term for a self-reflection meeting?

    Answer: Hansei

    Why: Toyota holds one even when a project succeeds, on the principle that no problem found is itself the problem.

Keep going in the app

Scan to open on your phone